KIMBERLEY-DE AAR ELECTRIFICATION

When the Kimberley-De Aar line was electrified, one line of the double track was left unwired and the section was signalled for single-track CTC with long crossing loops. In anticipation of increased ore traffic to the Eastern Cape from the Sishen branch north-west of Kimberley, work on wiring the s

Login

This content is for Premium Subscribers only. To view this content, please login or subscribe as a Premium Subscriber.

View Premium Subscription Options

I am a Premium Subscriber.

Related Articles