GAUTRAIN ROLLING STOCK ORDER COMPLETE

On 7 December, the last vehicles in Gautrain’s order were delivered by low loader at the system’s Midrand depot. This completes the fleet of 24 four-coach trainsets, totalling 96 vehicles in all. Fifteen coaches were constructed at Bombardier’s factory in Derby UK. The rest were assembled by Union Carriage at Nigel, Gauteng, using complete sets of imported parts.

One Response to “GAUTRAIN ROLLING STOCK ORDER COMPLETE”

  1. James Strachan December 14, 2010 at 19:10 #

    The next step is to build a lot more – to Cape guage.

Leave a Reply