Gautrain 1:18 turnout
Posted on 20 May 2009
Bombela inspects the pre-assembly of a 1:18 turnout at the VAE SA Isando plant. The 1:18 turnout is the first of its kind to be manufactured and installed in Africa. The turnout is to be installed to the entrance of the Marlboro tunnel.



Related posts:
- GAUTRAIN PROGRESS: ROSEBANK-SANDTON-MARLBORO
- GAUTRAIN PROGRESS: ROSEBANK-SANDTON-MARLBORO
- GAUTRAIN PROGRESS: ROSEBANK-SANDTON-MARLBORO
- GAUTRAIN PROGRESS: ROSEBANK-SANDTON-MARLBORO
- GAUTRAIN TRACKLAYING
Tags | turnout






















